ElfN
New Member
Posts: 9
|
Post by ElfN on Nov 16, 2009 16:07:08 GMT -8
I have my riser (6" well casing) and my radiator (extra large water pressure tank all prepped and ready to go) and my fire brick and red brick and clay and perlite and sand and . . . Oh, yeah, and stove pipe for the bit that goes up and out. I've built a test stove outside just to play. norishouse.com/archives/date/2008/08. You'll need to scroll down, the post is at the bottom. I couped some 6" stainless flexible ducting I would like to use for my thermal mass ducting. Has anyone built with it before? Any thoughts? Caveats? Thanks. ElfN
|
|
|
Post by gorbull on Nov 16, 2009 16:42:16 GMT -8
Sorry to say, yer link does not work.
|
|
|
Post by ytksgmt on Nov 17, 2009 8:08:27 GMT -8
|
|
|
Post by Donkey on Nov 17, 2009 8:36:08 GMT -8
Woah, elfnori... Why do you need a five foot tall heat riser??
|
|
ElfN
New Member
Posts: 9
|
Post by ElfN on Nov 27, 2009 6:10:43 GMT -8
Woah, elfnori... Why do you need a five foot tall heat riser?? <LOL> It isn't so much that I need the riser to be tall, I need the burn chamber to be a little longer. I need to go through a wall. ElfN
|
|